Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR
RVNL Floats Tender for Indore-Budni Section Construction

Infrastructure

RVNL Floats Tender for Indore-Budni Section Construction

Rail Vikas Nigam Limited (RVNL) has initiated a significant infrastructure project by issuing a tender for the construction of roadbeds, minor bridges, and associated works on the Indore-Budni section of the Bhopal Division under the West Central Railway in Madhya Pradesh. This development is a crucial component of the broader plan to enhance rail connectivity in the region.

Project Overview

The project, designated as Package 1B, encompasses the construction of a new broad-gauge (BG) railway line between Kheri (excluding) and Pipaliya Nankar stations, covering chainages from 57.400 km to 129.000 km. The scope of work includes:

  • Roadbed Construction: Establishing a stable foundation for the railway tracks.
  • Minor Bridges: Building small-scale bridges to facilitate uninterrupted rail movement.
  • Buildings: Erecting necessary structures to support railway operations.
  • Track Installation: Laying tracks, with the exclusion of supplying rails, sleepers, and thick web switches.
  • Civil Engineering and General Electrical Works: Executing various civil and electrical tasks essential for the project’s completion.

The total contract value for this package is estimated at ₹1,021.59 crore.

Strategic Importance

The Indore-Budni rail line is poised to serve as a vital link between the western and central parts of India. By providing a more direct route between Indore and Budni, the project aims to:

  • Reduce Travel Distance: Shortening the rail distance between these two points will lead to decreased travel times.
  • Enhance Economic Activities: Improved connectivity is expected to stimulate trade and commerce in the region.
  • Alleviate Congestion: Offering an alternative route will help ease traffic on existing lines, promoting more efficient rail operations.

Historical Context

The Indore-Budni rail project has been in the pipeline for several years. In 2016-17, the Ministry of Railways sanctioned the new electrified BG railway line between Mangliyagaon (Indore) and Budni, spanning approximately 198 km. This initiative was part of a broader strategy to bolster rail infrastructure in Madhya Pradesh.

Subsequent developments saw RVNL inviting bids for detailed design consultancy in 2021, focusing on tunnels and viaducts, including geotechnical investigations. This phase was crucial for addressing the challenging terrains and ensuring the structural integrity of the proposed rail line.

Current Developments

Advertisement. Scroll to continue reading.

As of August 2024, RVNL has progressed to the construction phase by floating the tender for Package 1B. This move signifies a transition from planning and design to actual on-ground execution. The deadline for bid submissions was set for September 25, 2024, indicating RVNL’s commitment to expediting the project’s completion.

Future Prospects

Upon completion, the Indore-Budni rail line is expected to:

  • Boost Regional Connectivity: Facilitating smoother movement of goods and passengers between key economic hubs.
  • Promote Sustainable Transportation: Offering an efficient alternative to road transport, thereby reducing carbon emissions.
  • Encourage Regional Development: Attracting investments and fostering socio-economic growth in Madhya Pradesh.

RVNL’s proactive approach in advancing this project underscores its dedication to enhancing India’s railway infrastructure, aligning with the nation’s broader goals of economic development and sustainable growth.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Law News Platforms – https://legalmatters.in/

You May Also Like

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.