Connect with us

Hi, what are you looking for?

Construction

MEIL expedites work on 19 km tunnel in Uttarakhand

MEIL expedites work on 19 km tunnel in Uttarakhand

The 19 km long Char Dham Rail Tunnel in Uttarakhand is being built more quickly thanks to Megha Engineering & Infrastructures Ltd. The tunnel is being dug and excavated by the business using cutting-edge NATM technology at a height of 2,250 feet above sea level in the eastern Himalayan peaks.

The cross passageways in package -7B’s 10 km of tunnel work have already been finished by the contractor. This difficult task was completed in just 18 months, despite extreme weather, landslides, floods, strong rock formations, and topographic difficulties. The MEIL was recognised as the top contractor for the Char Dham Project by the Rail Vikas Nigam Limited RVNL, which praised the company for completing its work quickly.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.