Connect with us

Hi, what are you looking for?

Apartment

L&T’s Mumbai Coastal Road Project sets world record in Tunnel Boring

L&T’s Mumbai Coastal Road Project sets world record in Tunnel Boring
L&T’s Mumbai Coastal Road Project sets world record in Tunnel Boring

By excavating 456.72 m at the prestigious Mumbai Coastal Road Project, Package 4, Larsen & Toubro’s 12.19 m dia Slurry TBM (Tunnel Boring Machine), known as “Mavala,” set a world record for monthly lengths. The TBM, currently the largest in use in the nation and deployed from Girgaon Chowpatty, broke the previous record held by a 13m single shield EPB (Earth Pressure Balance) TBM of 455.4 m for monthly tunnelling.

Delivery of TBM Mavala took place when the pandemic was at its worst. The TBM, weighing about 2,500 tonnes, was then lowered into the launching shaft in its finished state. Another creative strategy they used was to “rotate” the TBM inside the shaft to begin the second tunnel construction, which allowed them to cut down on the time it took to disassemble, lift, transport, and reassemble the tunnel by several months.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.