Connect with us

Hi, what are you looking for?

Ahmedabad

Contracts for L&T Construction’s water and wastewater treatment division are secured

Contracts for L&T Construction’s water and wastewater treatment division are secured

A client has awarded the international arm of the Water & Effluent Treatment Business a project to build and commission water supply schemes for various towns in Tanzania. The EXIM Bank of India is funding the project.

Design and construction of raw water intake systems, storage tanks, water treatment plants with a total capacity of 71 MLD, 5 clear water reservoirs, pumping stations, 263 km of pipeline, and associated electromechanical works make up the overall scope of work.

Additionally, the company has received domestic add-on orders from the Uttar Pradesh State Water & Sanitation Mission to implement various rural water supply projects under the Jal Jeevan Mission to provide functional house tap connections (FHTC) in the state.

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.