Heavy-Duty Excavation DifficultiesThere are a number of difficulties with excavation projects that might reduce output & raise expenses:High digging demands: In order to move...
Chennai Metro Rail Ltd plans to construct a 130-metre skywalk at Vadapalani station to link Phase-I and Phase-II metro corridors, improving commuter connectivity between...
Mining and Construction Equipment Summit Kicks Off at Taj Palace, New Delhi CIMReviews.com is proud to bring you exclusive coverage from the Mining and...
In 2018, the Ministry of Road Transport & Highways began construction of a 4.531 km two-lane tunnel at Silkyara, connecting Gangotri and Yamunotri via...
Over the past four-five years, tunnel construction in the country has increased due to longer lengths, challenging terrain, urbanization, and increased infrastructure demand. The...
projects, such as closed-loop slurry treatment plants. CFlo’s closed-loop STPs optimize bentonite recovery and water recycling, reducing the costs and environmental impact of traditional...
A partnership giving access to specially developed artificial intelligence (AI) created specifically to boost mineral recovery after open pit blasting in mining has recently...
Researchers in Energies propose an advanced framework for robotic technology systems in coal mining operations to enhance safety, efficiency, and intelligence, based on a...
Under Package UG03, URC Construction Pvt. Ltd. has started construction on Metro Line-3 of Chennai Metro Phase II. The event was conducted at Thousand...
Through an open market transaction, Larsen & Toubro Ltd. (L&T) paid ₹149.65 crore for 1.20 crore units of National Highways Infra Trust. L&T’s investment...
Approximately ₹6728.33 crore has been set aside by Shri Nitin Gadkari for the construction of eight segments of the NH-913 (Frontier Highway) in Arunachal...