HomeProjectConstruction

Authorities begin work on the Sadar railway gate underpass to reduce traffic.

Views: 341
0 0
Read Time:1 Minute, 7 Second
Authorities begin work on the Sadar railway gate underpass to reduce traffic.

The authorities have started work on the Sadar railway gate underpass to reduce traffic. The underpass will be built between the existing railway lines and the Sadar Road. The work is expected to be completed within two years. The underpass will have a width of 10 meters and a height of 5 meters. It will be able to accommodate two-way traffic.

Rajnath Singh, the MP for Lucknow and the union defence minister, is ignoring a number of projects, including the underpass. Following a meeting with locals and the defence minister, construction has begun. DRM SK Sapra, a senior DCM, and the railway crew were then ordered to conduct an underpass survey.

As a result of the closure of the Sadar railway gate, which connects Lucknow to the Cantt region, inhabitants of the Cantt and Purana Qila areas currently face a long commute. As a result, traffic bottlenecks and congested roads are now an everyday occurrence.

Advertisements

The outdated bridge linking KKV College and Azad Basti will shortly be replaced in order to address these problems with an elevated road. Moreover, the Azad Basti section of the Hyder Canal outflow

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.i
Podcast Platforms – https://anyfm.in/

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%