HomeProject

Vibrant Energy commissions a 66 MW EPC project from Tata Power Solar

Views: 534
0 0
Read Time:1 Minute, 48 Second
Vibrant Energy commissions a 66 MW EPC project from Tata Power Solar

Vibrant Energy has commissioned a 66MW EPC (engineering, procurement, and construction) project from Tata Power Solar, an integrated solar enterprise and a wholly-owned subsidiary of Tata Power.

The project will generate 110,029 energy units per year. Carbon emissions will be reduced by up to 9 lakh tonnes as a result of the installation. The project, which covers 191 acres and includes 1,27,268 solar modules, was finished in a record-breaking nine months.

Tata Power Solar and Vibrant Energy share the goal of being the country’s leader in innovation-driven renewable energy solutions. Tata Power Solar devised a one-of-a-kind execution strategy, deploying various teams to ensure the project’s seamless operation and commissioning at all levels. To assure the structural stability of the entire EHV (extra high voltage) system, the team built a two-level pooling sub-station on the undulating terrain and earthed the hard rock ground.

Advertisements

To eliminate delays caused by numerous shifts and to permit prompt regularisation, materials were dumped directly at the workplace. In addition, before commissioning, the modules were insured.

“We consider the commissioning of this huge EPC project for Vibrant Energy to be a significant milestone since it highlights our best-in-class project execution skills,” stated Dr Praveer Sinha, CEO and MD of Tata Power. We are confident that this project will establish a new bar for industry collaboration and will help India achieve its sustainable energy ambitions.”

“It also underscores Tata Power Solar’s commitment to lead India’s transition to a greener future through a strategic strategy and operational excellence,” said Ashish Khanna, president – renewables, Tata Power.

With this project’s completion, the company’s entire utility-scale solar project portfolio now stands at 9.7GWp.

“This project is a testament to our dedication to decarbonization and sustainable growth,” stated Srini Viswanathan, CEO of Vibrant Energy. We are honoured to work with Tata Power Solar on the EPC of a 66 MW project that was completed in a record-breaking 9 months.”

Construction, Infrastructure and Mining   Group Media Publication
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *