HomeProjectConstruction

Metro Manila Subway construction set to start as tunnel boring machine lowered

Views: 507
0 0
Read Time:39 Second
Metro Manila Subway construction set to start as tunnel boring machine lowered

Construction of the Metro Manila Subway Project (MMSP) is set to start. The tunnel boring machine to be used to drill underground was lowered on Sunday.

A tunnel boring machine has been lowered and positioned in Valenzuela City. President Rodrigo Duterte, Transportation Secretary Arthur Tugade, and Japanese Ambassador Kazuhiko Koshikawa attended the ceremony for the first tunnel-boring machine to be used in the Philippines.

The project is funded by a loan granted to the Philippines by the Japanese government, he said. The 33-kilometer underground MMSP will have 17 stations that will be connected via a network of tunnels and bridges.

Advertisements

Construction, Infrastructure and Mining   Group Media Publication
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *