Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR
Work allotted for six-laning of 75.54km Ludhiana-Bathinda NH

Construction

Work allotted for six-laning of 75.54km Ludhiana-Bathinda NH

Two separate construction companies have been assigned to the project, which includes the six-laning of the 75.543-kilometer Ludhiana-Bathinda national highway. While Ram Kumar contractor was awarded package 1 of the 30.3-kilometer greenfield expressway, Ceigall India Ltd was awarded package 2 of the 45.243-kilometer stretch on the NH-754-AD. The project’s two packages, totaling 1,716 crores, are expected to be completed in two years.

You May Also Like

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Construction

The selection of India as the host country for the ICCC (International Climate Change Conference) in 2027 is a significant recognition of India’s commitment...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.