Sticky Post Ranjit Buildcon & Dilip Buildcon JV wins Surat Metro’s Package CS5 The 19.26 km Line-2 of the Surat Metro, which connects Bhesan and Saroli, will have a 10.559 km Package CS5 that will be built... Yukta Singh23/06/2022