Tag: cimr

1 39 40 41 42 43 410 / 426 POSTS
CIDCO clears 1,160 ha land for Navi Mumbai airport

CIDCO clears 1,160 ha land for Navi Mumbai airport

The entire 1,160 hectares of land has been made available for airport construction. The Navi Mumbai International Airport Limited (NMIAL) crossed [...]
Minimizing downtime in mining operations with set to spec equipment

Minimizing downtime in mining operations with set to spec equipment

Mining companies need reliable heavy equipment and machinery 24/7 to achieve their objectives. Machine downtime has a major impact on profit and [...]
Construction: Adieu!

Construction: Adieu!

Steel production in the July to May period (11M) rose 33 percent against last year. Domestic dispatches for cement however, dropped by 2 percent [...]
MoRTH approves expansion of NH-146 (B) in MP

MoRTH approves expansion of NH-146 (B) in MP

The extension of NH-146 (B) from Budhni to Bari and from Nasrullaganj to Sandalpur has been approved by the Union Minister for Road Transport and [...]
China’s Massive Hydro Energy Storage Goals May Be Getting Bigger

China’s Massive Hydro Energy Storage Goals May Be Getting Bigger

China's biggest dam builder says the country is launching an even-larger-than-expected campaign. More than 200 pumped hydro stations with a combi [...]
Construction workers seek redressal of raw materials price hike, distribution of m-sand

Construction workers seek redressal of raw materials price hike, distribution of m-sand

A petition has been submitted to Tirunelveli District Collector V Vishnu requesting distribution of m-sand during a grievance meet. Union members [...]
9 vehicles involved in illegal mining seized

9 vehicles involved in illegal mining seized

JAMMU, June 12: Police in RS Pura, Jhajjar Kotli, Sidhra, Phallian Mandal, and Talab Tillo recovered nine illegal mining vehicles.According to police [...]
Mangaluru: Illegal soil, red stone mining rampant in Dakshina Kannada

Mangaluru: Illegal soil, red stone mining rampant in Dakshina Kannada

Most of the illegal soil transportation is carried out in the taluk of Bantwal. The soil from Dakshina Kannada has great demand in Andhra Pradesh. Th [...]
Metro Manila Subway construction set to start as tunnel boring machine lowered

Metro Manila Subway construction set to start as tunnel boring machine lowered

Construction of the Metro Manila Subway Project (MMSP) is set to start. The tunnel boring machine to be used to drill underground was lowered on [...]
Alaska mining engineer to manage Palmer

Alaska mining engineer to manage Palmer

Constantine Metal Resources Ltd. has appointed Ernie Siemoneit to the project manager and senior engineer for the Palmer copper-zinc-silver-gold- [...]
1 39 40 41 42 43 410 / 426 POSTS