A 70-meter steel bridge was successfully launched over two DFCCIL tracks near Vadodara, Gujarat for the Mumbai-Ahmedabad Bullet Train project. This is the seventh...
The Mumbai-Ahmedabad Bullet Train project is transforming the economic landscape of Ahmedabad and the entire corridor by connecting major cities into one unified economic...
A 260-meter-long PSC bridge over National Expressway-4 near Kosamba, Surat, was completed in February 2025 as part of the Mumbai-Ahmedabad Bullet Train Project. Constructed...
A 210-meter-long pre-stressed concrete (PSC) bridge over National Highway-48 at Dabhan village, near Nadiad in Gujarat’s Kheda district, was completed on January 9, 2025....
In Gujarat, work on building the Mumbai-Ahmedabad Bullet Train’s track is underway, with track construction bases established close to Surat and Anand. Now that...
A 100-meter-long steel bridge was inaugurated on August 25, 2024, as part of the Mumbai-Ahmedabad Bullet Train project in Dadra & Nagar Haveli, close...
Another river bridge on the Mumbai-Ahmedabad High-Speed Rail Corridor, also known as the bullet train, has been completed. Reaching 120 metres between the bullet...
On the fringes of the 50th G7 Summit, Japanese Prime Minister Fumio Kishida recently met with Prime Minister Narendra Modi. The ambitious Mumbai-Ahmedabad High-Speed...
Excavation has begun on the 394-meter Additionally Driven Intermediate Tunnel (ADIT) at Ghansoli for the Mumbai-Ahmedabad Bullet Train Project. This would hasten the construction...