A 260-meter-long PSC bridge over National Expressway-4 near Kosamba, Surat, was completed in February 2025 as part of the Mumbai-Ahmedabad Bullet Train Project. Constructed...
A 210-meter-long pre-stressed concrete (PSC) bridge over National Highway-48 at Dabhan village, near Nadiad in Gujarat’s Kheda district, was completed on January 9, 2025....
In Gujarat, work on building the Mumbai-Ahmedabad Bullet Train’s track is underway, with track construction bases established close to Surat and Anand. Now that...
A 100-meter-long steel bridge was inaugurated on August 25, 2024, as part of the Mumbai-Ahmedabad Bullet Train project in Dadra & Nagar Haveli, close...
Another river bridge on the Mumbai-Ahmedabad High-Speed Rail Corridor, also known as the bullet train, has been completed. Reaching 120 metres between the bullet...
On the fringes of the 50th G7 Summit, Japanese Prime Minister Fumio Kishida recently met with Prime Minister Narendra Modi. The ambitious Mumbai-Ahmedabad High-Speed...
Excavation has begun on the 394-meter Additionally Driven Intermediate Tunnel (ADIT) at Ghansoli for the Mumbai-Ahmedabad Bullet Train Project. This would hasten the construction...
For the Mumbai-Ahmedabad Bullet Train Project, a 21-kilometer tunnel between Shilphata and the Bandra Kurla Complex is being built. Three Tunnel Boring Machines (TBMs)...
The groundbreaking J-Slab track system, the first of its kind in India, will be implemented as part of the Mumbai-Ahmedabad Bullet Train project. It...
The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project has been making headlines ever since it was first announced. The latest development in the project is that...