A four-lane bridge connecting Nariman Point and Colaba is being developed by the Mumbai Metropolitan Region Development Authority (MMRDA) for a price of 284.55...
The Hyderabad Metropolitan Development Authority (HMDA) is prepared to start the construction of a bridge at Mir Alam Tank soon with an investment of...
With investments totaling 1,648 crore, the West Bengal government is considering building a four-lane bridge over the Muriganga River to link Sagar Island with...
Bokaro: On Saturday, an under-construction bridge being erected by the state public works department (PWD) at Rangamatia Jodia that would have connected Rangamatia and...
The National High-Speed Rail Corporation Limited (NHSRCL) has accelerated work on the 1.2-kilometer long Narmada River bridge in Bharuch, Gujarat, which will be the...
By June 2024, the longest bridge on the Narmada River, which is part of the Mumbai-Ahmedabad High-Speed Rail Corridor, should be completed. The 1.2-kilometer-long...