Sticky Post L&T’s Mumbai Coastal Road Project sets world record in Tunnel Boring By excavating 456.72 m at the prestigious Mumbai Coastal Road Project, Package 4, Larsen & Toubro’s 12.19 m dia Slurry TBM (Tunnel Boring Machine),... Yukta Singh08/08/2022
Sticky Post L&T’s Mumbai coastal road project sets a world record in tunnel boring By excavating 456.72 m at the Mumbai coastal road project, Package 4, Larsen & Toubro’s 12.19 m dia slurry TBM (tunnel boring machine), known... Yukta Singh04/08/2022