Green energy

Suzlon Group Secures 82 MW Wind Energy Project from Oyster Green

A 82 MW wind energy project by Oyster Green Hybrid One has been acquired by Suzlon Group.

Oyster Green Hybrid One has granted Suzlon Group a wind energy project with a capacity of 82 MW. At Oyster Green’s location in Agar, Madhya Pradesh, 26 wind turbine generators (WTGs), each with a rated capacity of 3.15 MW, will be installed as part of the project. Suzlon will oversee the entire project’s execution, including its erection and commissioning, and it will also offer thorough operations and maintenance (O&M) services after it has been put into service. The project’s electricity would be directed towards the commercial and industrial (C&I) customer segment, with the aim of advancing the adoption of renewable energy in India.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version