Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR

Air train

SJVN bags first 15MW floating solar project

SJVN has bagged its first 15 MW grid connected floating solar PV power project at Nangal pond, near village Neilla, district Bilaspur, Himachal Pradesh. SJVN has bagged the project on a Build Own and Operate basis through e-reverse auction held by Solar Energy Corporation of India.

Nand Lal Sharma, CMD, said, “The company is focusing on developing renewable energy to emerge as major contributor in realizing government of India’s vision to generate 500 GW energy by 2030 from non-fossil sources.” The cost of developing this project shall be approximately Rs 100 crore.

SJVN now has 11 solar power projects of 2965 MW capacity under different stages of development with a total portfolio of more than 16800 MW. These recent addition of new projects is taking SJVN to new heights.

Complete News Source : Construction Week

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Construction

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.