For a contract given by South East Central (SEC) Railway, Rail Vikas Nigam Limited (RVNL) has obtained the lowest bidder (L1) status. The Champa-Saragaon-Baraduar-Sakti segment will use auto signalling with electronic interlocking (based on OFC) as.
part of the project. In the Champa-Sakti segment of the Bilaspur Division of SEC Railway, this entails making modifications to the current electronic interlocking systems as well as supplying, installing, testing, and commissioning new electronic interlocking, MSDAC & IPS.
The contract includes all indoor and outdoor work, including building and electrifying huts, and has a 15-month completion deadline. Amritsar-Jamnagar Rail Vikas Nigam Limited (RVNL) has secured a significant milestone by emerging as the lowest bidder for a crucial railway infrastructure project under the South East Central Railway (SEC Railway). This achievement further strengthens RVNL’s position as a key player in India’s railway modernization and expansion efforts.
Project Details and Scope
The SEC Railway contract involves the execution of a vital infrastructure upgrade, which includes track doubling, signaling enhancements, and overhead electrification. The project is expected to improve rail connectivity, enhance operational efficiency, and support the growing freight and passenger traffic in the region. RVNL’s scope of work includes:
- Track Doubling: Expanding the existing rail network to improve capacity and reduce congestion.
- Electrification: Ensuring energy-efficient and sustainable railway operations.
- Modern Signaling System: Enhancing safety and efficiency through advanced signaling technologies.
- Bridge & Civil Works: Strengthening railway infrastructure to withstand increased traffic demands.
Significance of the Contract
Winning this bid further consolidates RVNL’s reputation as a leading railway infrastructure company in India. The SEC Railway project is expected to:
- Boost Connectivity: The project will enhance transportation links across key industrial and commercial hubs.
- Improve Efficiency: Reduced transit time and better rail network utilization will benefit both freight and passenger operations.
- Promote Sustainability: Electrification will contribute to a greener railway network by cutting down dependence on fossil fuels.
Competitive Bidding and Financial Aspects
The bidding process saw participation from multiple infrastructure firms, reflecting the high demand and competitiveness in railway contracts. RVNL’s bid was found to be the most cost-effective while meeting all technical requirements. The final contract value is expected to be disclosed following formal award confirmation by SEC Railway.
Way Forward
With the successful bid, RVNL is set to commence work upon receiving official clearance. The project aligns with the Indian Railways’ broader vision of modernizing infrastructure and achieving greater efficiency. By leveraging its expertise, RVNL is poised to deliver the project within stipulated timelines while maintaining high-quality standards.
This development underscores RVNL’s growing footprint in India’s railway sector and its commitment to advancing the country’s transportation infrastructure.
Group Media Publication
Construction, Infrastructure and Mining
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/
