Project

Railway unveils ₹1.2 lakh cr Mysuru-Chennai bullet train project

The government of Tamil Nadu is getting ready to begin the land acquisition process for the construction of a high-speed rail corridor between Mysuru and Chennai via Bengaluru, which will cover the 435-km distance in about three hours as opposed to the current 8–9 hours. In order to complete the project as soon as possible, the Center recently instructed National High-Speed Rail Corporation to submit a thorough project report.

It will cost 1.2 lakh crore to construct it along the 10-lane NH between Bengaluru and Mysuru. Land will be provided by the state government, and the Center will pay for all building expenses. In two years, it is anticipated that nine new rail lines, including Munirabad-Mahbubnagar, Tumakuru-Rayadurga, Chikkamagaluru-Belur, and Tumakuru-Davanagere, will be operational.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version