Connect with us

Hi, what are you looking for?

Infrastructure

PM Modi Inaugurates ₹29,400 Cr Infrastructure Projects in Mumbai

PM Modi Inaugurates ₹29,400 Cr Infrastructure Projects in Mumbai
PM Modi Inaugurates ₹29,400 Cr Infrastructure Projects in Mumbai
Additionally, PM Modi launched the ₹6,300 crore Goregaon-Mulund Link Road (GMLR) Tunnel Project.

Prime Minister Narendra Modi inaugurated several significant infrastructure projects worth over ₹29,400 crores in Mumbai, Maharashtra. The Thane-Borivali Tunnel Project, valued at ₹16,600 crores, will connect the Western Express Highway at Borivali with Thane Ghodbander Road, reducing travel time by 12 km. PM Modi initiated the Goregaon-Mulund Link Road (GMLR) Tunnel Project, worth ₹6,300 crores, connecting the Western Express Highway and Mulund, providing direct connectivity to Navi Mumbai airport and the Pune-Mumbai Expressway.

The Prime Minister inaugurates Kalyan Yard Remodeling and Gati Shakti Multi-Modal Cargo Terminal in Navi Mumbai, enhancing capacity and reducing congestion, while creating local employment opportunities. PM Modi dedicated new platforms at Lokmanya Tilak Terminus and extended platforms at Chhatrapati Shivaji Maharaj Terminus Station, enhancing passenger capacity and station efficiency. The Prime Minister launched the Mukhyamantri Yuva Karya Prashikshan Yojana, an ₹5,600 crores internship program aimed at reducing youth unemployment by offering skill enhancement and industry exposure.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.