Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR

Mining

Odisha gets longest river bridge over Mahanadi river in Cuttack

Chief Minister Naveen Patnaik inaugurated the longest Mahanadi River Bridge in Odisha at Gopinathpur in Cuttack on Monday. The 3.4-kilometer-long bridge adopts a “T”-shaped design and the construction cost is 11.1 billion rupees.

According to the Orissa state government, this bridge is a long-standing need of the locals. It will shorten the distance between Badamba and Banki Baideswa by 45 kilometers and connect it to the temple of St. Hanat .

The state government said in a statement: “The bridge connecting Badain Banarasingpur and Baidshwar in Banki. It will benefit more than 500,000 people and contribute to tourism, agriculture and commerce in the region. development of.”

Complete News Source : Business Stand

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.