A tender for the four-laning of the Parmakudi to Ramanathapuram segment of NH-87 in Tamil Nadu has been released by the National Highways Authority of India (NHAI). The expansion of NH-87 is crucial for Tamil Nadu’s transportation network. The project is expected to.
Under Package II, the project covers 22.525 kilometers, ranging from km 104.500 to km 127.025. It would be carried out at an estimated cost of ₹816.01 crore using the hybrid annuity method (HAM). This initiative is part of the government’s broader plan to strengthen the national highway network and facilitate economic development.
NHAI Invites Bids for ₹816 Crore NH-87 Four-Laning Project in Tamil Nadu
The National Highways Authority of India (NHAI) has invited bids for the four-laning of National Highway 87 (NH-87) in Tamil Nadu. The project, valued at ₹816 crore, is aimed at enhancing road infrastructure, easing traffic congestion, and boosting connectivity in the region.
Project Details
The NH-87 four-laning project will cover a significant stretch, improving road quality and increasing the highway’s capacity to handle vehicular movement. The scope of work includes the construction of four lanes, upgrading existing road infrastructure, building service roads, flyovers, culverts, and pedestrian crossings to enhance safety and efficiency.
The project is expected to be executed under the Hybrid Annuity Model (HAM), which allows for a combination of public and private sector participation. Under this model, the government and the private developer share the financial burden, reducing risks and ensuring efficient project execution.
Strategic Importance
Improve connectivity between key cities and industrial hubs. Facilitate faster movement of goods and passengers. Reduce travel time and fuel consumption. Enhance road safety and reduce accident rates. With Tamil Nadu being a significant contributor to India’s economy, better road infrastructure is essential for industries such as manufacturing, agriculture, and trade.
Government’s Infrastructure Push
The NH-87 project aligns with the Government of India’s emphasis on infrastructure development. Under the Bharatmala Pariyojana, a flagship highway development program, several key projects are being undertaken to modernize India’s road network. The government has been consistently increasing budgetary.
Timeline and Bidding Process
The bidding process for the NH-87 four-laning project has commenced, with interested companies required to submit their proposals within the specified timeframe. The selection will be based on technical qualifications, financial viability, and project execution capabilities.
Once awarded, the project is expected to be completed within a stipulated timeline, ensuring minimal disruption to traffic. The construction phase will generate employment opportunities, providing a boost to the local economy.
Challenges and Expectations
While the project presents significant benefits, potential challenges include land acquisition, environmental clearances, and logistical constraints. However, NHAI has been proactive in addressing these issues through streamlined policies and stakeholder engagement.
The success of this project will serve as a model for future highway expansions, demonstrating the government’s commitment to enhancing infrastructure and allocations for highway projects, recognizing their impact on economic growth improving road networks across India.
The Border Roads Organisation (BRO) has successfully completed the renovation of the Jawahar Tunnel, a crucial all-weather passage linking Jammu with the Kashmir Valley. The modernization of the tunnel, situated at an altitude of 2,194 meters, aims to enhance safety, improve traffic flow, and boost connectivity in the region.
Key Upgrades in the Renovation
- Improved Ventilation System: Advanced air circulation systems have been installed to reduce pollution levels and maintain visibility. LED lighting and modern road signage have been added to ensure safer driving conditions. The renovation ensures smoother movement of vehicles, reducing travel time and along the vital project is expected to.
Group Media Publication
Construction, Infrastructure and Mining
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
