Connect with us

Hi, what are you looking for?

Adani Gangavaram

NHAI invites bids for ₹1,993.88-cr elevated corridor

NHAI invites bids for ₹1,993.88-cr elevated corridor
NHAI invites bids for ₹1,993.88-cr elevated corridor

The National Highways Authority of India has issued an RFP for a 1,993.88 crore elevated road corridor in Kerala that runs from Aroor to Thuravoor Thekku. Under the Bharatmala Pariyojana on engineering procurement and construction (EPC) model.

the scope of work includes the construction of a six-lane elevated corridor as well as the development of an existing four-lane road at ground level from Aroor to Thuravoor Thekku section of NH 66 (length – 12.752 km). It has to be completed in three years.

Construction, Infrastructure and Mining   Group Media Publication
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.