Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR

Construction

NHAI floats tenders for ₹619.48-cr flyovers & underpasses

The National Highways Authority of India (NHAI) has tendered for the construction of the four-lane Chillakuru Cross road to Turpu Kanupur in Andhra Pradesh.

The scope of work included the construction of a four-lane road from 0.000 km (131.500 km for NH-16) to 23.770 km from Chillakuru Cross Road to Turpu Kanupur (Part 1) on the new NH-516W, including a six-lane overpass and NH-16.

( Length – 1.050 v) and six lanes from Turpu Kanupuru to the south gate of the port (part 2 of the second package) from 23.770 km to 35.015 km, using the Bharatmala Pariyojana Phase-I on the new NH-516W in Andhra Pradesh HAM mode.

Complete News Source : Construction World

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Construction

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.