Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR
MoRTH Issues Tender for DPR on Minor Bridge Reconstruction in Jharkhand

Ministry of Road Transport

MoRTH Issues Tender for DPR on Minor Bridge Reconstruction in Jharkhand

The Ministry of Road Transport & Highways (MoRTH) has invited bids for a detailed project report (DPR) for reconstructing minor bridges at km 92 and km 96 of NH-522 in Jharkhand. The scope includes designing approach roads extending at least two kilometers on either side of the bridges.

Finalizing the span arrangement for uniform flow distribution, and determining the alignment and orientation of river training works and bridge axes. Prime Minister Shri Narendra Modi will inaugurate two significant projects during his visit to Haryana. The Namami Gange Programme (NGP) offers a ₹100 billion opportunity for Engineering.

Procurement, and Construction (EPC) players, with an estimated pending outlay of ₹150 billion. The Project Monitoring Group (PMG) of the Department for Promotion of Industry and Internal Trade (DPIIT) conducted a comprehensive review of key infrastructure projects in Bihar, West Bengal, and Odisha.

J Kumar Infraprojects secured a Letter of Acceptance (LoA) for a major coastal road project in Navi Mumbai. The New & Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) invited bids to select a development partner for setting up a municipal solid waste (MSW) to energy processing facility in the Kakinada-Rajahmundry region.

The Ministry of Road Transport and Highways (MoRTH) has issued a tender for the preparation of a Detailed Project Report (DPR) for the reconstruction of a minor bridge in Jharkhand. The initiative aims to enhance road safety, improve connectivity, and upgrade the state’s transportation infrastructure.

Project Overview

The tender invites consultancy services to assess the current condition of the bridge, analyze structural integrity, and propose a detailed plan for reconstruction. This move is part of MoRTH’s ongoing efforts to modernize national and state highways, ensuring they meet safety and durability standards.

Scope of Work

The consultancy firm selected for the project will be responsible for Assessing the existing bridge structure and surrounding environment. Evaluating the strength, material durability, and safety concerns. Understanding the impact on local transportation and water flow beneath the bridge.

Cost Estimation & Project Feasibility – Providing a financial and technical feasibility report for effective execution. Proposing engineering solutions that comply with MoRTH guidelines Jharkhand’s road network the state’s economic development, connecting industrial hubs, rural areas, and national highways. The reconstruction of this minor bridge will.

Advertisement. Scroll to continue reading.

Importance of the Project Ensure Safer and Smoother Transport – Reducing the risk of accidents and roadblocks Facilitating movement of goods and people across regions Enhancing trade, tourism, and local businesses.

MoRTH’s Commitment to Infrastructure Development

MoRTH has been actively investing in highway and bridge projects across India to enhance road safety and efficiency. The department’s focus on structural rehabilitation aligns with the government’s vision of creating world-class transport infrastructure.

The issuance of this DPR tender for minor bridge reconstruction in Jharkhand marks another step toward improving India’s highway infrastructure. Once completed, the project will significantly enhance road safety, connectivity, and economic growth in the region.

The Ministry of Road Transport and Highways (MoRTH) has invited tenders for preparing a Detailed Project Report (DPR) for the reconstruction of a minor bridge in Jharkhand. This initiative aims to improve road safety, connectivity, and infrastructure resilience in the region.The selected consultancy firm will be responsible for.


Conducting site surveys and investigations to assess structural integrity. Analyzing geological, traffic, and hydrological conditions. Designing an economically and technically viable reconstruction plan. Estimating project costs and ensuring compliance with MoRTH guidelines.

The bridge’s reconstruction is essential for Enhancing transport safety and reducing risks of structural failures. Boosting regional connectivity by improving access for commuters and businesses. Supporting economic growth, trade, and local industries in Jharkhand.

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.