HomeConstruction

MMRDA ready to start work on tallest elevated metro corridor

Views: 547
0 0
Read Time:53 Second
MMRDA ready to start work on tallest elevated metro corridor

The elevated Metro Line-6 (Swami Samarth Nagar – Jogeshwari – Vikhroli), which runs between Jogeshwari Vikhroli Link Road and the Eastern Express Highway, is ready to begin construction work, according to the Mumbai Metropolitan Region Development Authority.

With a height of 38 metres when it is completed, it will be the city’s tallest elevated metro line; in contrast, other Metro corridors are being constructed at a height of 16 metres on average. Kanjurmarg will be the tallest station along the Metro 6 route, rising to a height of about 30 mt, or about the height of a 10-story building. The Metro 6 corridor will be 20 mt above the ground, above the LBS Marg, the JVLR, and the upcoming Metro 4 Wadala-Kasarvadavali line. At the intersection, both of these metro lines will have stations that are connected by a footbridge.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

Advertisements
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *