Ahmedabad

MMRDA floats tender for ₹284.5 cr bridge connecting Nariman Point & Cuffe Parade

The Mumbai Metropolitan Region Development Authority has floated a tender for design and construction of the four-lane bridge connecting Nariman Point and Cuffe Parade, which will act as the last mile connectivity on the southern end for the under-construction coastal road.

On the Cuffe Parade side, while one arm of the road will go towards Captain Prakash Pethe Marg, another will go to Wodehouse Road. It will have a 100 m span in between to allow fishing boats, a walking track and a cycling track, and a gallery from where people can watch the sea.The estimated cost of the project is ₹284.5 crore and it is expected to be completed in two years.

Complete News Source : NBM&CW

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version