Construction

L&T Bags Orders for Buildings & Factories Business

A project has been obtained by Larsen & Toubro’s business vertical, buildings and factories, from the Institute of Neurosciences Kolkata. According to the deal, a medical college and hospital complex in Kolkata would be built using a design-build methodology. The project, which will be finished in two stages over the course of 60 months, includes a medical college and a hospital with 605 beds. External development activities and civil constructions are included in the scope.

Furthermore, L&T’s Buildings and Factories division has obtained several add-on orders.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version