The Naluchira bridge, Kerala’s first extradosed cable-stayed bridge, spans 458 meters and will open to traffic soon. Built at ₹60.73 crore, it connects the Ambalappuzha-Thiruvalla State Highway to NH 66, providing vital road connectivity for Naluchira and Illichira residents By providing an alternative route, the bridge eases congestion on existing roads and highways.
Kerala has achieved a major milestone in infrastructure development with the completion of its first extradosed cable-stayed bridge. This engineering marvel, designed to enhance connectivity and ease traffic congestion, represents a significant step forward in the state’s modern transportation network.
Project Overview
The newly completed extradosed cable-stayed bridge is located over a key river, connecting major urban centers and improving regional accessibility. The project, undertaken by the state’s Public Works Department (PWD) in collaboration with leading construction firms, features cutting-edge engineering and state-of-the-art materials to ensure durability and efficiency.
Key Features and Engineering Excellence
- Hybrid Design: The bridge integrates the features of both a girder bridge and a cable-stayed bridge, offering superior load distribution and structural efficiency With a central span supported by stay cables, the design reduces the need for excessive piers, minimizing environmental impact High-performance concrete and corrosion-resistant cables enhance.
- Aesthetic Appeal: The sleek, modern design adds to the visual landscape of Kerala’s urban infrastructure the bridge’s longevity and resilience against harsh weather conditions Use of precast segments and balanced cantilever methods accelerated the construction process, reducing project timelines The bridge links key commercial and residential hubs, significantly reducing travel time.
- Boost to Economic Growth: Improved transportation infrastructure facilitates smoother in Kerala, movement of goods and people, benefiting local businesses and industries The design incorporates eco-friendly practices, including minimal riverbed disruption and efficient energy usage.
Challenges and Overcoming Them
The project faced multiple challenges, including difficult terrain, monsoon-related delays, and logistical constraints. However, with meticulous planning, innovative engineering solutions, and collaboration between government agencies and private contractors, the bridge was successfully completed within the projected timeline.
Future Prospects
With the successful completion of Kerala’s first extradosed cable-stayed bridge, the The bridge spans a key river, Department (PWD) with top durability and efficiency. state sets a benchmark for future infrastructure projects. This bridge paves the way for more advanced and sustainable urban transport solutions, reinforcing Kerala’s commitment to modernization and development.
The completion of this landmark project highlights Kerala’s progress in adopting world-class infrastructure solutions. As the state continues to invest in smart transportation networks, the new extradosed cable-stayed bridge stands as a testament to engineering excellence and sustainable urban development.
Kerala has marked a major milestone with the completion of its first extradosed cable-stayed bridge. Designed to improve connectivity and ease traffic congestion, this state-of-the-art structure enhances the state’s transportation network connecting vital . Developed by the Public Works.
Hybrid Design: A combination of girder and cable-stayed bridge elements for optimal load distribution Fewer piers reduce environmental impact Corrosion-resistant cables and high Advanced techniques accelerated project completion performance concrete ensure longevity A sleek, modern structure enhancing Kerala’s urban landscape.
Better Connectivity: Reduces travel time between key locations Provides an alternative route, easing pressure on existing roads Supports trade and commerce by improving transport efficiency Designed with minimal bridge sets a benchmark for future infrastructure projects in Kerala, reinforcing the state’s commitment to modernization and sustainable urban development.
Kerala has achieved a significant milestone in its infrastructure development with the completion of its first extradosed cable-stayed bridge. This engineering marvel, which blends the features of both cable-stayed and box girder bridges, marks a leap forward in the state’s connectivity and transport efficiency.
- Group Media Publication
- Construction, Infrastructure and Mining
- General News Platforms – IHTLive.com
- Entertainment News Platforms – https://anyflix.in/