Construction

JSW Energy begins construction of battery storage project in Rajasthan

Recently, Solar Energy Corporation of India Limited (SECI) awarded the project to the company.

On Monday, JSW Energy announced that work on a one gigawatt-hour (GWh) battery energy storage system project in Rajasthan’s Fatehgarh had begun.

According to a recent exchange filing by JSW Energy, the company was awarded the project by Solar Energy Corporation of India Limited (SECI).

The project comprises of two installations, intended to store for two hours in a single cycle, each having a 500 MWh storage capacity. The project will be constructed using a Build Own Operate and Transfer (BOOT) system, and the corporation stated that after 12 years, ownership will pass to the offtaker.

According to JSW Energy, the project is anticipated to be commissioned by June 2025.

A Memorandum of Understanding (MoU) between the firm and JSW Steel Ltd. commits the latter to providing an extra 85,000–90,000 tonne of green hydrogen per year and 7,20,000 tonne of green oxygen per year (TPA), gradually by 2030.

“Our Battery Energy Storage System project represents a crucial advancement in enhancing grid stability and integrating renewable energy sources,” stated Sharad Mahendra, Joint Managing Director and CEO of JSW Energy.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version