Construction

In Maharashtra, Sanghvi Movers Lifts a 670 MT Splitter Column Section

At the Petrochemical Complex of GAIL (India) Limited in Usar, Maharashtra, Sanghvi Movers Limited has lifted the biggest Splitter Column piece, weighing 670 MT, using its largest crane, which has a capacity of 1600 MT. With a total weight of 1605 MT and a length of 125 metres, the load was raised with the use of SANY SCC16000A and Demag CC2800-1 cranes. This accomplishment demonstrates Sanghvi Movers Limited’s outstanding proficiency in heavy lifting and its commitment to superior crane operations.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.

Exit mobile version