Construction

In Ludhiana, work on a 35-kilometer e-way stretch between Delhi and Katra was awarded

A joint venture called OJSC Euro-Asian Construction Corporation Evrascon-MKC Infrastructure Ltd has been awarded the contract to build the 35.09-kilometer stretch of the Delhi-Amritsar-Katra expressway Package 8 of Phase 1 from Ludhiana-Malerkotla near Bhogiwal village to Ludhiana-Moga road near Mullanpur Dakha.

The 39-kilometer stretch of one of the six greenfield expressways identified under the Bharatmala Pariyojna Phase-I and included in the list of 22 greenfield corridors in the Budget announcements for this fiscal falls across 24 villages in Ludhiana district, out of the 361.656-kilometer proposed length in Punjab.

The same company was also awarded a 43.04-kilometer stretch of the same expressway Package 9 under Phase 1 from Ludhiana-Moga road near Mullanpur Dakha to Jalandhar-Moga road near Kang Sahibu village.

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version