Construction

In Ludhiana, work on a 35-kilometer e-way stretch between Delhi and Katra was awarded

A joint venture called OJSC Euro-Asian Construction Corporation Evrascon-MKC Infrastructure Ltd has been awarded the contract to build the 35.09-kilometer stretch of the Delhi-Amritsar-Katra expressway Package 8 of Phase 1 from Ludhiana-Malerkotla near Bhogiwal village to Ludhiana-Moga road near Mullanpur Dakha.

The 39-kilometer stretch of one of the six greenfield expressways identified under the Bharatmala Pariyojna Phase-I and included in the list of 22 greenfield corridors in the Budget announcements for this fiscal falls across 24 villages in Ludhiana district, out of the 361.656-kilometer proposed length in Punjab.

The same company was also awarded a 43.04-kilometer stretch of the same expressway Package 9 under Phase 1 from Ludhiana-Moga road near Mullanpur Dakha to Jalandhar-Moga road near Kang Sahibu village.

You May Also Like

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Construction

The selection of India as the host country for the ICCC (International Climate Change Conference) in 2027 is a significant recognition of India’s commitment...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.

Exit mobile version