Ahmedabad

In HP, IRB Infra wins the HAM road project

The Pathankot-Mandi section of the national highway in Himachal Pradesh has been awarded to IRB Infrastructure Developers. The NHAI has also given the company an Appointed Date for the Project of Rehabilitation.

Upgrade to Four-Lane Configuration & Strengthening of the Punjab/HP Border Highway. The company won the project using the Hybrid Annuity Model (HAM), and to carry it out, it formed an SPV that is about to begin construction on the mega road project’s first package.

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version