Infrastructure

Gurugram-Pataudi-Rewari NH Likely to Complete by March 2025

60% of the construction of the 43 km Gurugram-Pataudi-Rewari National Highway is anticipated to be concluded by March 2025. The Wazirpur-Rewari segment is expected to open by December, while the Dwarka Expressway-Wazirpur segment is expected to be finished by the following year, according to NHAI officials. A 180-meter, two-lane flyover over the Dwarka Expressway is part of the project, and it will link to NH-352W.

Gurugram-Pataudi-Rewari NH Likely to Complete by March 2025

The much-anticipated Gurugram-Pataudi-Rewari National Highway (NH) is on track for completion by March 2025. This highway project aims to improve connectivity, ease traffic congestion, and enhance regional economic development by providing seamless transportation between these key locations in Haryana.

Project Overview

The Gurugram-Pataudi-Rewari NH is a major infrastructure project designed to strengthen road connectivity between Gurugram, a key economic hub, and Rewari, a vital transit point. The highway will also enhance accessibility to Pataudi, known for its industrial and residential developments.

Key Features of the Project

  • Total Length: Approximately 50 kilometers
  • Road Expansion: Four-lane highway with provisions for future expansion
  • Modern Infrastructure: Includes flyovers, underpasses, service lanes, and toll plazas
  • Smart Traffic Management: Implementation of intelligent traffic control systems and CCTV monitoring
  • Sustainability Measures: Use of eco-friendly construction materials and water conservation techniques

Significance & Benefits

The highway is expected to:

  • Reduce Travel Time: Minimize congestion and shorten the commute between Gurugram, Pataudi, and Rewari.
  • Boost Economic Growth: Facilitate trade, investment, and industrial development in the region.
  • Improve Safety & Accessibility: Enhanced road design and security measures for commuters.
  • Support Urban & Industrial Expansion: Strengthen infrastructure for residential and commercial developments.

Current Progress & Timeline

The construction work is progressing steadily, with major segments nearing completion. The authorities have set a target to complete the project by March 2025, ensuring that all critical infrastructure elements are in place.

The Gurugram-Pataudi-Rewari NH is a significant infrastructure development that promises to transform regional connectivity and economic growth. Upon completion, it will provide a faster, safer, and more efficient transport link, benefiting commuters, businesses, and industries in Haryana.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Law News Platforms – https://legalmatters.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version