Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR

Architecture

Gujarat Board floats tender for fishery harbor at Veraval Phase-II

The Gujarat Maritime Commission has submitted a tender (package) for the development of the Veraval (Phase II) fishing port in the Gir Somnath district.

The scope of work includes the reclamation of the offshore works, the dredging of parts B and the repair of parts D of the west and east breakwaters of the port works, as well as debris removal and demolition.

The work has an estimated value of Rs 167.96 crore and took 36 months to complete.

Complete News Source : Construction Week

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Construction

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.