Construction

Foundation Stone Laid for Karo and Konar Coal Handling Plants

Union Minister Shri Satish Chandra Dubey inaugurated the Karo and Konar Coal Handling Plants in Bokaro and Kargali, aiming to boost coal handling and processing in the region. Karo and Konar coal handling plants will facilitate First Mile Rail Connectivity, transporting coal from mines to railway circuits for thermal power plants and other consumers, replacing road transport.

The Konar Coal Handling Plant, costing ₹322 crore, includes a hopper, crusher, 10000 tonne coal storage bunker, and 1.6 km conveyor belt. It transfers coal to railway wagons via a 1000 tonne Silo bunker, accelerating dispatch. The Konar Coal Handling Plant, costing ₹322 crore, features a hopper, crusher, 10000 tonne coal storage bunker, and 1.6 km conveyor belt, accelerating coal dispatch to railway wagons.

Foundation Stone Laid for Karo and Konar Coal Handling Plants

The foundation stone for the Karo and Konar Coal Handling Plants has been officially laid, marking a significant milestone in India’s coal infrastructure development. These state-of-the-art facilities are set to enhance coal handling efficiency and support the growing energy demands of the nation.

Project Overview

The Karo and Konar Coal Handling Plants are part of a broader initiative to modernize coal logistics in India. These plants will be equipped with advanced technologies to ensure efficient coal transportation, processing, and storage.

Key Features & Benefits

  • Automated Coal Handling System – Reduces manual intervention, ensuring higher efficiency.
  • Dust Suppression Mechanism – Minimizes environmental impact and enhances workplace safety.
  • High-Throughput Capacity – Capable of handling large volumes of coal efficiently.
  • Seamless Connectivity – Strategically located to streamline coal distribution across key industrial regions.

Economic & Industrial Impact

The establishment of these coal handling plants is expected to:

  • Boost Coal Supply Chain – Enhance the efficiency of coal transportation and reduce bottlenecks.
  • Support Power Generation – Strengthen coal availability for thermal power plants.
  • Create Employment Opportunities – Generate jobs in construction, operations, and maintenance.
  • Improve Environmental Compliance – Incorporate eco-friendly measures to align with sustainability goals.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Law News Platforms – https://legalmatters.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version