Ahmedabad

DMRC readies plan for Central Vista Loop Metro Corridor

The DMRC has released a tender to select the design consultant for the station interiors of the planned Central Vista Metro Loop Corridor in addition to producing the detailed project report (DPR). There will be four stations along the loop corridor, which will start and terminate at the Central Secretariat. The four stations’ exits are planned to offer direct access to the office buildings through escalators, staircases, and walkways, in contrast to the normal Metro stations. The DPR’s parameters, which include the size and depth of the Metro stations, the number of coaches to be deployed, and the interior design theme, will serve as the design consultant’s guide.

According to the early designs, there will be three to four coaches deployed every train, and they are probably smaller in size as well, enabling quick movement and sharper bends. The Central Vista project and the corridor’s construction will both move forward simultaneously. Due to the Central Secretariat metro station’s role as an interchange station that links the yellow and violet lines, the corridor is expected to experience a daily peak foot traffic of 20,000 people.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

2025

Titagarh Rail Systems Limited (TRSL) has secured a ₹537.11 crore contract from Ambuja Cements and ACC, part of Adani Cement, to manufacture 16 BCFCM...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version