Mining

DMRC floats tender for erection of special steel spans

For the Phase-IV portion of the metro project, the Delhi Metro Rail Corporation (DMRC) has issued e-tenders for the supply, manufacture, transportation, and erection of three unique steel spans at various locations.

For the elevated integrated viaduct section of line-10 of the Aerocity-Tughlakabad corridor of phase-4, between Saket-G and Sangam Vihar, steel spans will be erected at Mandir Marg on the metro viaduct and two at Ambedkar Nagar T-Point on M.B. Road (one each at metro viaduct and PWD flyover level), requiring an investment of 25.23 crores and a completion period of 9 months.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.

Exit mobile version