Project

DMRC floats tender for erection of special steel spans

For the Phase-IV portion of the metro project, the Delhi Metro Rail Corporation (DMRC) has issued e-tenders for the supply, manufacture, transportation, and erection of three unique steel spans at various locations.

For the elevated integrated viaduct section of line-10 of the Aerocity-Tughlakabad corridor of phase-4, between Saket-G and Sangam Vihar, steel spans will be erected at Mandir Marg on the metro viaduct and two at Ambedkar Nagar T-Point on M.B. Road (one each at metro viaduct and PWD flyover level), requiring an investment of 25.23 crores and a completion period of 9 months.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.

Exit mobile version