A key component of the Mumbai-Ahmedabad Bullet Train Project, the Sabarmati Rolling Stock Depot represents a paradigm leap toward sustainable and effective infrastructure. The depot, which covers 83 hectares, is the biggest of its kind and has state-of-the-art facilities for both light and heavy maintenance. Its cutting-edge amenities, which include inspection bays, washing plants, workshops, and stabling lines, were inspired by Japanese depots.
The depot intends to grow to 8 inspection lines and 29 stabling lines in the future from its initial 10 stabling lines and 4 inspection lines. Comprehensive maintenance capabilities are ensured by specialized facilities such as bogie swap lines.
A specialized test track, industrial sheds, centralized control facilities, and staff amenities, including auditoriums and dining rooms, are some of the features.
The depot embraces sustainability by putting eco-friendly programs, including waste management systems, wastewater recycling, and rainwater collection, into practice. The installation of solar panels for energy generation is planned for the future.
The Sabarmati Depot, a representation of both technological innovation and environmental responsibility, establishes new standards for dependability and efficiency that influence the success of the Mumbai-Ahmedabad Bullet Train Project.
Group Media Publication
Construction, Infrastructure and Mining
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/