Author: Yukta Singh
Ejipura flyover: Contractor blames BBMP for construction delays
The BBMP was also chastised by the company for only releasing 75% of the mobilisation monies required to start the project.
Bengaluru: Citing the [...]
BMC issues circular to builders to make construction sites monsoon-safe
The BMC has ordered that builders not perform excavation work during the monsoon because of the three site cave-ins that were recorded last year.
[...]
Indian space startup Agnikul makes history with world’s first 3D-printed rocket engine launch
An important turning point for India's developing private space industry is this mission.
The world's first rocket propelled entirely by 3D printi [...]
This AI company grew 4X in a year, surpassing even world’s major stock exchanges
Nvidia's crucial part in the AI revolution has caused its stock price to nearly quadruple over the last 12 months.
In less than a year, the comput [...]
Big Tech develops AI networking standard but without chip leader Nvidia
The market leader in AI chips, Nvidia, which holds an 80% market share, is not included in the grouping.
In an attempt to challenge market leader [...]
Mumbai Metropolitan Region Set for 34% Growth in Skyscrapers by 2030
Over the next six years, the number of towers in the Mumbai Metropolitan Region (MMR) is expected to rise significantly.
Over the next six years, [...]
Man Industries Secures ₹490 Cr Orders
Leading Indian steel line pipe supplier to the gas, oil and water distribution industries, Man Industries, has announced fresh orders totaling 490 cr [...]
Ministry of Mines Hosts Granite & Marble Mining Workshop in Bengaluru
Recently, the Ministry of Mines held a workshop in Bengaluru with an emphasis on the granite and marble mining industry.
A workshop on the granite [...]
Runwal Unveils Breeze at its Landmark Project in Thane
The best tower in Runwal's flagship project, Runwal Lands End, the first gated community in Kolshet's Thane district, is called Breeze.
Within the [...]
Highway Construction Slows in India Due to Election Delays
Elections have caused a considerable slowdown in India's highway constructing during the last two months.
Due to difficulties in obtaining licence [...]