Connect with us

Hi, what are you looking for?

Air train

Ashoka Buildcon bags ₹692.50cr rail project

Ashoka Buildcon bags ₹692.50cr rail project

Ashoka Buildcon ready to acquire £692.50 railway project as it has been selected as the lowest bidder for the Northern Frontier Railway for electrification of parts of the Rangiya (excl)-Murkongselek railway, including Rangapara North (excl Rangapara branch line) ).

Appeared. Dekargaon, Balipara (excl.) – Bhalukpong, Harmuty (excl.) – Naharlagun, Sripani – Dhamalgaon (excl.), Furkating Jn. (excl.) after Mariani Jn. (Not included) and Tinsukia to Dangri Makum Jn to Tirap, 733.35/947.59 of North East Frontier Railway RKM/TKM – EPC type, an official spokesman said.

Complete News Source : NBM&CW

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.