Connect with us

Hi, what are you looking for?

Air train

Ashoka Buildcon bags ₹692.50cr NFR’s contract

Ashoka Buildcon has won the Northeast Frontier Railway contract entailing ₹692.50 crore investment. It has also received the letter of acceptance from the NFR Railways. The project involves electrification of Railway Lines of the sections Rangiya (excluding)- Murkongselek including branch lines of Rangapara.

North (excluding)- Dekargaon, Balipara (excluding)- Bhalukpong, Harmuty (excluding)-Naharlagun, Sripani-Dhamalgaon (excluding), Furkating Junction (excluding) to Mariani in (excluding) and Tinsukia to Dangri Section including branch line of Makum into Tirap, Northeast Frontier Railway RKM / TKM on EPC model in Assam. The entire project has to be completed in 900 days.

Complete News Source : NBM&CW

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Sticky Post

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.