Agency

Afcons Infra begins construction on a $2,481 million metro route

Cengrs Geotechnica has begun geotechnical and geophysical investigation work for Package DC-05 of the Delhi Metro Magenta Line’s 28.92 km Janakpuri West – RK Ashram extension, under a subcontract from Afcons Infrastructure. This is the extension’s final civil package, on which work has begun. Derawal Nagar and RK Ashram are connected by this 7.46 km.

underground section of the 65.1 km Delhi Metro Phase 4 project, which includes six stations at Derawal Nagar, Ghanta Ghar, Pulbangash (interchange with Red Line), Sadar Bazar, Nabi Karim, and Ramakrishna Ashram Marg (interchange with Blue Line).

Afcons was awarded the $2,481.50 crore Package DC-05 contracts with a 42-month deadline and has since begun organising machinery and manpower. Cengrs will drill 110 exploratory boreholes in soil and rock to a depth of 45 metres.

You May Also Like

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

2025

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

2025

Elgi Equipments has introduced its STABILISOR compressed air stabilization technology to address issues of unstable compressor performance, inefficiency, and excessive wear caused by frequent...

Project

According to state transport minister P Paiwang Konyak, the north border railway has prioritised building a direct rail link from Dimapur-Dhansiripar to Kohima-Sechu by...

Copyright © 2020 ZoxPress Theme. Theme by MVP Themes, powered by WordPress.

Exit mobile version