The 19.26 km Line-2 of the Surat Metro, which connects Bhesan and Saroli, will have a 10.559 km Package CS5 that will be built by Ranjit Buildcon Ltd. and Dilip Buildcon Ltd.
It will connect Bhesan – Adajan – Majura Gate through 11 elevated stations and establish an interchange with Line-1 at Majura Gate in the city’s centre as part of the 40.35 km Surat Metro Phase 1 project in west Surat.
The project’s scope is for building a 10.559 km elevated viaduct and 11 stations (excluding roofing, architectural finishing, and E&M) from Bheshan dead end to Majura Gate Station, as well as a viaduct ramp to a depot entry close to Bheshan (Package 1). At Bhesan, Botanical Garden, Ugat Vaarigruh, Palanpur Road, LP Savani School, Performing Art Centre, Adajan Gam, Aquarium, Badri Narayan Temple, and Athwa Chopati, 11 elevated stations will be constructed.
Construction, Infrastructure and Mining Group Media Publication
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/