Connect with us

Hi, what are you looking for?

CIMR
CIMRCIMR
Tender Issued for Construction of Road Over Bridges in Vadodara-Geratpur Segment

Construction

Tender Issued for Construction of Road Over Bridges in Vadodara-Geratpur Segment

A tender has been released by Western Railway to build three road over bridges (ROBs) between Vadodara and Geratpur. Building two-lane ROBs with approaches at three different places is part of the work. It is anticipated that the ₹111.46 crore contract would be finished in 18 months. The date of the bid deadline is April 23, 2024.

Tender Issued for Construction of Road Over Bridges in Vadodara-Geratpur Segment

The Indian Railways has floated a tender for the construction of multiple Road Over Bridges (ROBs) in the Vadodara-Geratpur section, aiming to enhance rail and road infrastructure while ensuring smooth traffic flow. The project is part of the ongoing infrastructure modernization initiative, which focuses on eliminating level crossings to improve safety and efficiency for both railway and road users.

Project Scope and Objectives

The tender covers the construction of ROB structures at key level crossings within the Vadodara-Geratpur segment. These ROBs will help reduce congestion, enhance commuter safety, and improve rail operations by eliminating delays caused by level crossings. The primary objectives of the project include:

  • Eliminating Level Crossings: Unmanned and manned level crossings often lead to traffic congestion and safety hazards. The new ROBs will eliminate the need for road traffic stoppages at railway crossings.
  • Enhancing Safety: The project aims to prevent accidents at level crossings by providing seamless road connectivity over the railway tracks.
  • Improving Rail Efficiency: With fewer interruptions from road traffic, train operations in the Vadodara-Geratpur segment will become smoother and more punctual.
  • Boosting Road Infrastructure: The construction of ROBs will improve road network integration and reduce travel time for vehicles.

Tender and Execution Details

The project will be executed under the Engineering, Procurement, and Construction (EPC) model, ensuring a structured and efficient construction process. The tender specifies the following key details:

  • Scope of Work: The design, construction, and commissioning of multiple ROBs, including approach roads and safety features.
  • Technical Requirements: Bidders must demonstrate prior experience in similar large-scale bridge construction projects.
  • Financial Eligibility: Contractors must meet financial criteria, including turnover requirements and bank guarantees, to qualify for the bid.
  • Project Timeline: The completion period for the ROBs is expected to be within the stipulated time frame as per Indian Railways’ planning guidelines.
  • Submission Deadline: Interested firms must submit their bids before the deadline mentioned in the official tender notice.

Reduced Traffic Congestion: Vehicles will no longer need to stop for passing trains, leading to smoother and faster road movement. The construction of ROBs in the Vadodara-Geratpur segment is expected to bring multiple benefits.

  1. Safety Improvements: Eliminating railway crossings reduces the risk of accidents involving pedestrians and vehicles. Economic Growth: Improved road connectivity will benefit industries, logistics, and local businesses by ensuring seamless transportation. Enhanced Railway Operations: Trains can maintain speed and schedule without frequent stoppages at level crossings.

A Step Toward Modernized Rail Infrastructure

This initiative aligns with Indian Railways’ broader mission to modernize its infrastructure and improve safety measures across the country. The construction of ROBs has been a key priority under various government initiatives, including the Gati Shakti program and Vision 2030 railway development plan.

With the tender now open for bidding, the project is set to play a crucial role in enhancing regional connectivity, reducing travel delays, and improving overall transport efficiency in the Vadodara-Geratpur.

Group Media Publication
Construction, Infrastructure and Mining   
General News Platforms – IHTLive.com
Entertainment News Platforms – https://anyflix.in/
Legal and Laws News Platforms – https://legalmatters.in/
Podcast Platforms – https://anyfm.in/

You May Also Like

Project

Andhra Pradesh is poised to gain a 318-kilometer-long expressway connecting Kurnool in AP and Solapur in Maharashtra. The project will be developed by the...

Uncategorized

On the 111-km-long, still-under-construction Banihal-Katra Railway link, Northern Railway has made considerable progress by breaking through T-48 tunnel, the fourth-longest tunnel in Indian Railways,...

Infrastructure

In order to assure compliance with essential standards for horizontal and vertical clearances, which are vital for safe passage, any bridge building across a...

Company

Title: Balason Bridge Construction in West Bengal’s Darjeeling District: An Engineering Triumph Introduction: In the picturesque Darjeeling district of West Bengal, a remarkable engineering...

Copyright © 2025 Anyflix Media And Entertainment Private Limited. GSTIN = 07AASCA2022K1ZN.